innovative construction company | ellingson companies Skip to content

Subsurface Irrigation in Gum Neck, NC

March – April, 2018

The climate in North Carolina offers the opportunity for two growing seasons – but during certain times of the year there is a shortage of subsurface moisture. Ellingson provided a solution for Black Gold Farms by installing a fully automated, complete drainage and subsurface irrigation systems. From design to installation, Ellingson provided a solution that afforded an ability to irrigate the subsurface soil as well as an adequate drainage system to remove excess water. The outcome was a major increase in land condition and an overall ROI for Black Gold Farms.

Contact Us
Excavation site for subsurface irrigation project in Gum Neck, NC, featuring heavy machinery and construction workers managing drainage infrastructure.
Back To Top