CIPP – Pipe Rehabilitation in Healthcare Facility

2018

An off-site plumber identified holes in a hospital’s sewer main, which ran directly underneath what they called the power plant of the hospital. Because of its location, it was impossible to dig down to the pipe to rehab it, so the only other alternative was seemingly to dig a completely new line in a completely new direction. EIM came up with a plan to line the existing pipe using their cured-in-place-pipe (CIPP) solution, which effectively lined the existing pipe so that it no longer leaked. The hospital’s on-site plumber dealt with flow control, setting up the by-pass to patient care rooms, while EIM completed their work at night to limit the amount of flow through (or impact to) that by-pass system.

Contact Us

Our Services

Our end-to-end solutions are built upon industry experience and technology-driven innovation that consistently deliver return on investment and reduced risk for our customers.

Our Values

Our core values come through in how we show up, in the way we work, in the structure of our offering, in the types of people we hire, and in the type of customers we attract.

© 2020, Ellingson Companies. All Rights Reserved.

Back To Top