Skip to content

CIPP – Pipe Rehabilitation in Hospital Parking Garage

2019

Ellingson was contracted to solve a major safety issue with a hospitals parking facility.  The hospitals’ storm drains would back up and flood. The Ellingson Assessment team assessed/inspected and with the help of the Ellingson Technology team, created a map of the storm drains of the facility. Ellingson discovered a broken pipe under the concrete.  The Ellingson lining team used one of our “Trenchless Solutions” CIPP to line the 8” diameter pipe and solved their safety issue.

Contact Us
Allina-St. Paul Blue Parking Garage
Back To Top